PK Vesta announces the order of a pre-engineered food production center in Moscow, Russia
02/14/2014
PK Vesta announces the order of a pre-engineered steel building (food-processing center) in Moscow region, Russia (Series INDI - 12W х 50.4L х 5.1H max). The building is based on the built-up welded plate with the secondary framing (cold-formed zinc-coated profiles). The whole building consists of two parts (a 2-storey office and 1-storey production facility). The color scheme is based on the gray and yellow colors. The erection process will start in 3 months at the beginning of 2014 summer. The steel building was designed and priced in the FREE online system – WebSteel accessible worldwide 24/7.