PK Vesta announces the final erection of a pre-engineered food processing center in Moscow region, Russia
11/05/2014
PK Vesta announces the final erection of a pre-engineered food processing center in Moscow region, Russia (12W х 50.4L х 5.1/3.9H = Series INDI). A steel building consists of two functional zones: a two-storey office (based on the tapered welded beams - S245) and 2) a production facility (based on the cold-formed zinc-coated profiles - S350). Two zones form the single pre-engineered steel building with the different heights. Windows, gates and doors will be installed in the nearest time.
A steel building was priced and designed FOR FREE in the web-based innovative system WebSteel available worldwide 24/7.