PK Vesta announces the erection of a pre-engineered steel plant of rubber products in Tula, Russia
11/08/2016
PK Vesta announces the erection of a pre-engineered steel plant of rubber products in Tula, Russia (Series INDI - 18W х 66L х 10.3H) based on the effective hybrid systems (columns were made from the welded plates, whereas the trusses and secondary framing from LSGF - cold-formed profiles) The special artisanal way of building erection had been applied. The columns and preliminary assembled trusses with secondary framing (2 pairs) were mounted in parallel. That way, the erection process decreases by roughly 1.5-2 times less. The steel building will be fully installed by the end of 2016.
Video sample on how the hybrid systems are erected (designed in WebSteel):