PK Vesta announces the shipment of the building kit to Tula, Russia
03/25/2014
PK Vesta announces the final shipment of the pre-engineered steel building (building kit for a garment factory). The steel building was designed and priced in the FREE online system WebSteel based on the construction technology RIGID STEEL FRAMING (welded beam from the furious metal). Now a client is ready to receive the first part of a building kit (a metal backbone) Later on, the sheathing products will be shipped to the construction site.