Installation of the frame for the prefabricated store 20 x 12 x 7.5 in Novomoskovsk, Russia is completed
11/20/2012
PK "Vesta" has begun the final stage of installation of a prefabricated building from light metal structures in Novomoskovsk. The frame of the building was erected as soon as possible, in about 1.5 weeks. The last stage of construction will be the installation of the running part of the building. The front side of the complete building will be completely made of black glass.
To increase the speed of installation work, all design elements of the frame are numbered with stickers.
The building was designed in the free WebSteel system and will be used as a sports store. Commissioning is scheduled for the third quarter of 2013.