Order of the prefabricated steel auto repair center in the Moscow region, Russia
04/30/2013
The release date scheduled for commissioning - the end of August 2013.
The steel building was designed in the free online system WebSteel. The client chose the vertical ready-to-use sandwich panels. The colors: yellow, blue and light gray. The upper and lower part of the building will be visually separated by a strip of blue.
It is planned that the building will be located by 2 car lifts. In one working day, a client expects to serve 10 vehicles.