Plant PK Vesta announces the order of a pre-fabricated treatment plant 12W x 18D x 5.5H in St. Petersburg, Russia
We inform you that one of the Russian engineering companies has placed an order for an innovative pre-fabricated purification plant 12W x 18L x 5.5H made out of light metal structures at the Tula Plant PK Vesta for the needs of Russian Railways in the suburbs of St. Petersburg, Russia. The company offers numerous solutions for wastewater treatment and water treatment in Russia and the CIS, participating in all stages of project implementation - from investment assessment to operation.
The treatment steel building was designed on the basis of modern LSGF technology (cold-formed profiles), which provides 100% protection against corrosion (even some of the ferrous metal elements are powder coated with protection of at least 90-100 microns) The steel frame is sheathed with non-combustible sandwich panels (walls - 100mm, roof - 120mm) The building kit includes all fittings and fasteners.
The prefabricated steel building was designed in the free online system WebSteel.