How are rigid framing buildings erected? (welded beams)
A building kit with the 100% bolted-together design is delivered to the construction site. Assembly drawings and all layouts are attached (translated into the required language beforehand) Vertical columns with bases are mounted first, then trusses with a secondary framing. Next wall and roof sandwich panels are mounted. And all trimming elements are sewn up with the further installation of gates, doors and windows.
The cost of the foundation largely depends on the type of soil, for the determination of which engineering and geological surveys are required. Based on the results of the geo study, the type of foundation and the depth of its foundation are selected. Then the exact cost of foundation work (the amount of concrete, materials and working time) is determined.
WebSteel online system calculates the cost of the foundation of a pre-fabricated building for conventional (most common) soils. However, in most cases, the calculation is quite accurate. At the negotiation stage, it can be used to draw up a preliminary construction budget.
After the conclusion of the transaction, the client receives the terms for the design and manufacture of a complete building (foundation plan) At the initial stage of design, the client receives a grid of columns, and at the stage of shipment of products from the territory of the plant - installation diagrams. The grid of columns helps the client to prepare the foundation in advance, in parallel with the manufacture of a set of pre-fabricated buildings in our production.
Below are the basic steps for installing the rigid framing building on the basis of a welded beam starting from the preparation of the foundation to the commissioning of the facility (Coca-Cola warehouse in Ryazan, Russia)